SDLG 210 excavator fitted with VIBRA FV280 to perform the solar pile driving in the customer constru

다른 비디오
November 27, 2022
Category Connection: 스파일 드라이버 롱 붐
Brief: Discover the SDLG Excavator Mounted Pile Driving Vibro Hammer, designed for solar construction projects. This innovative equipment, fitted with VIBRA FV280, ensures easy installation and faster pile driving, maximizing efficiency and profits. Perfect for supporting solar panels with minimal human effort and time.
Related Product Features:
  • Strong vibration moment and compact structure for efficient performance.
  • High configuration with hydraulic motor and German FAG bearing for durability.
  • Easy installation and faster pile driving process saves time and labor.
  • Integrated import control valve for convenient maintenance and checks.
  • Two-stage vibration frequency control for enhanced excitation force.
  • Mini and lightweight design for flexible application on various terrains.
  • Utilizes excavator hydraulic system, saving fuel and transportation costs.
  • Simple operation, suitable for excavator drivers with minimal training.
자주 묻는 질문:
  • Are you a manufacturer?
    Yes, we have been in this field for more than 12 years, with our factory located in Suzhou. You are welcome to visit during working hours.
  • What is the warranty period?
    The warranty period is 12 months from the date of installation completion, covering the mainframe and key components, except for wearing parts.
  • What is the delivery time?
    The delivery time is generally 7-35 days, arriving at Shanghai Port. Overseas shipping time should be considered separately.
관련 동영상

VIBRA FV model large pile length

다른 비디오
January 05, 2021

사이드 그립 파일드라이버

SV 측면 접착 스파일 드라이버
September 25, 2025

사이드 그립 비브로 망치

SV 측면 접착 스파일 드라이버
April 14, 2025

VIBRA in Different Color

다른 비디오
December 15, 2020